Black Brant 11 build

Jeff G

Member
Here is the sub floor. Turned out to be the hardest part of the build . lots of fine tuning to get it right.
2012-07-18%2013.48.24_zpsrfk0tqcu.jpg
2012-07-18%2013.48.03_zpseaiwg9rd.jpg

2012-07-24%2012.15.24_zpslgyclasy.jpg

Filling the pontoons with foam.
2012-07-26%2015.07.57_zpswpdukgec.jpg

Running conduit for lights
2012-07-27%2011.19.51_zpsevtbsvb6.jpg

Reinforced the nose with 1 inch ss threaded rod. with alum plates
2012-07-28%2011.54.43_zps6mqaoi8h.jpg



2012-07-28%2011.57.51_zps6cgy0mai.jpg



Added steel for the cleats. drill and taped at a later time
2012-07-30%2015.35.02_zpsjlgj2ijo.jpg





2012-07-30%2015.35.14_zpshki6w35x.jpg

foaming nose
2012-07-30%2015.35.46_zps8yrpgylz.jpg



more pics to come
 
Back
Top