Here is the sub floor. Turned out to be the hardest part of the build . lots of fine tuning to get it right.
Filling the pontoons with foam.
Running conduit for lights
Reinforced the nose with 1 inch ss threaded rod. with alum plates
Added steel for the cleats. drill and taped at a later time
foaming nose
more pics to come
Filling the pontoons with foam.
Running conduit for lights
Reinforced the nose with 1 inch ss threaded rod. with alum plates
Added steel for the cleats. drill and taped at a later time
foaming nose
more pics to come