Capt Jeff Kraynik
Well-known member
Prior to gutting interior, the boat started as a standard 1995 side console Crestliner. We fully decked it out, changed to an Islamorada console & attached a rubrail
Sand blasting before painting. The front deck has been extended back an additional (18) eighteen inches
I used aluminum Riv-Nuts purchased from McMasters-Carr to attach just about everything to keep corrosion between the S/S hardware & the hull
Islamorada console
Finished product, staked out @ the sandbar near Sebastian Inlet
We figured we added (221) two-hundred & twenty one pounds of material.
(3) three 4x8 sheets of .075
(40) forty feet of support bracing
(1) one spool of alunimum welding wire